Highest listed annual water level at this semi-tidal site in these dates
3.554 m
Source dates: Sunday 17th of October 2021 to Saturday 17th of October 2026
Each ruler has its own fitted display scale. Positions cannot be compared between cards. Its ends are display limits, not normal or flood levels.
Among 4 retained annual values dated 17 October 2021 to 17 October 2026, OPW lists the highest annual source entry at 3.554 m for Aasleagh Br on 23 November 2024.
These are annual source entries, not complete-period maxima or statistical return periods. OPW marks this entry unchecked. The historical reference is not water depth and has not been matched with current readings. It is not a flood threshold. The archived reference is Poolbeg (3.500 m gauge datum), not Malin Head. The source does not identify the chosen 2024 peak as tidal or fluvial.
OPW's station description captured on 27 August 2026 describes a semi-tidal velocity-area site, 25–30 m wide, at the downstream face of the R335 bridge near the mouth of Killary Fjord, with rocky bed and stone walls; it says the bridge was rebuilt in 2002. It reports that continuous flow data are not produced, a rating was implemented in February 2026 and an annual-maximum flow series is available using the fluvial component. It records measurements since 1987, more frequent since 2021, and a rating to 0.67 times QMED extrapolated beyond 101 cubic metres per second. These archived flow-method claims do not validate current flow, a median water level, flood onset, a stage ceiling or safety. The selected annual offset is 3.500 m and the metadata datum is explicitly Poolbeg, not Malin Head; no conversion or common axis is established. The questionable physical-distance claim in the original description is withheld from public assignment without silently repairing it. Reverse-order bridge-work dates in older 2000/2002 notes and a 2009 missing-peak note are outside these windows and are not repaired or transferred to the selected levels. This unplotted publisher account has MODERATE confidence in faithful attribution; underlying methods, reference and present applicability have not been independently verified. It does not establish a warning, all-clear, safe range, current flow or flood impact.
There are 4 listed annual values within these fixed research dates, not continuous sampling across the full interval.
Archived source description
OPW's station description captured on 27 August 2026 describes a semi-tidal velocity-area site, 25–30 m wide, at the downstream face of the R335 bridge near the mouth of Killary Fjord, with rocky bed and stone walls; it says the bridge was rebuilt in 2002. It reports that continuous flow data are not produced, a rating was implemented in February 2026 and an annual-maximum flow series is available using the fluvial component. It records measurements since 1987, more frequent since 2021, and a rating to 0.67 times QMED extrapolated beyond 101 cubic metres per second. These archived flow-method claims do not validate current flow, a median water level, flood onset, a stage ceiling or safety. The selected annual offset is 3.500 m and the metadata datum is explicitly Poolbeg, not Malin Head; no conversion or common axis is established. The questionable physical-distance claim in the original description is withheld from public assignment without silently repairing it. Reverse-order bridge-work dates in older 2000/2002 notes and a 2009 missing-peak note are outside these windows and are not repaired or transferred to the selected levels.
This unplotted publisher account has MODERATE confidence in faithful attribution; underlying methods, reference and present applicability have not been independently verified. It does not establish a warning, all-clear, safe range, current flow or flood impact.