Highest listed annual water level in these dates
2.447 m
Source dates: Sunday 17th of October 2021 to Saturday 17th of October 2026
Each ruler has its own fitted display scale. Positions cannot be compared between cards. Its ends are display limits, not normal or flood levels.
Among 4 retained annual values dated 17 October 2021 to 17 October 2026, OPW lists the highest annual source entry at 2.447 m for Sallaghan on 3 November 2022.
These are annual source entries, not complete-period maxima or statistical return periods. OPW marks this entry unchecked. The historical reference is not water depth and has not been matched with current readings. It is not a flood threshold.
OPW's description captured on 27 August 2026 describes Sallaghan as a 14 m wide velocity-area site approximately 130 m downstream of the northernmost spur of Lough Gowna. It reports seasonal vegetation, high gaugings that did not appear impeded by downstream bushes and trees, and a rating to 1.38 times QMED with stable curves back to 1956. It reports a gap in digitised water levels and continuous flow estimates from 2002 to 2007 and says drone footage is available; that footage was not inspected. Those are archived publisher accounts, not verification of current flow, a median water level, a measurement ceiling, present vegetation effects or current reference compatibility. Annual entries and digitised continuous records have different roles; the gap does not erase listed annual entries or justify joining records. The 2002–2007 gap, a 2006 null, and a 1999 recorder note that the recorded peak may have been exceeded are outside all selected windows and are not transferred to the chosen levels or their completeness confidence. The selected annual offset and archived gauge datum are 61.325 m, labelled Malin Head OSGM15. This unplotted publisher account has MODERATE confidence in faithful attribution; underlying methods, reference and present applicability have not been independently verified. It does not establish a warning, all-clear, safe range, current flow, access, present operation, protection or flood impact.
There are 4 listed annual values within these fixed research dates, not continuous sampling across the full interval.
Archived source description
OPW's description captured on 27 August 2026 describes Sallaghan as a 14 m wide velocity-area site approximately 130 m downstream of the northernmost spur of Lough Gowna. It reports seasonal vegetation, high gaugings that did not appear impeded by downstream bushes and trees, and a rating to 1.38 times QMED with stable curves back to 1956. It reports a gap in digitised water levels and continuous flow estimates from 2002 to 2007 and says drone footage is available; that footage was not inspected. Those are archived publisher accounts, not verification of current flow, a median water level, a measurement ceiling, present vegetation effects or current reference compatibility. Annual entries and digitised continuous records have different roles; the gap does not erase listed annual entries or justify joining records. The 2002–2007 gap, a 2006 null, and a 1999 recorder note that the recorded peak may have been exceeded are outside all selected windows and are not transferred to the chosen levels or their completeness confidence. The selected annual offset and archived gauge datum are 61.325 m, labelled Malin Head OSGM15.
This unplotted publisher account has MODERATE confidence in faithful attribution; underlying methods, reference and present applicability have not been independently verified. It does not establish a warning, all-clear, safe range, current flow, access, present operation, protection or flood impact.